Sl No.
Name of Project and Location
Name and address of Client
Details of Design
Proof Checking Authority
1
Provision of Seawater Intake Complex for MTC at Visakhapatnam.
Chief Engineer (Navy), Station Road, Visakhapatnam – 530 004.
Cooling Water complex for machine test centre
Development Consultants Ltd., Kolkata.
2
Conversion of Jetties WJ2 & WJ3 into a Multipurpose Quay Berth at Port Trust, Visakhapatnam.
Chief Engineer, Visakhapatnam Port Trust, Visakhapatnam.
Bored cast-in-situ piles of 850 mm dia, 800 mm thick diaphragm wall & 2200 mm deep RCC cellular deck.
I.I.T., Madras.
3
Construction of Multipurpose Berth EQ-7 in the Inner Harbour at Port Trust, Visakhapatnam.
Chief Engineer, Visakhapatnam Port Trust, Visakhapatnam.
255 M long berth consisting of 600 mm thick diaphragm wall, 850 & 750 mm bored cast-in-situ piles & 2000 mm deep RCC cellular deck.
I.I.T., Madras.
4
Special Foundation Package for Pile foundations for Narmada & Mahi River Crossing Towers for 400 KV Gandhar Transmission Line, Gujarat.
Power Grid Corporation of India Ltd., Hemkunt Chambers, 10th Floor, 89 Nehru Palace, New Delhi.
Bored cast-in-situ Pile of 760mm, 1000mm & 1200mm dia and pile caps.
Power Grid Corpn. of India Ltd., New Delhi.
5
Pile foundations for Tower No. 284 Kawas-Haldarwah line of River Narmada-Mahi River Crossing near Bharuch, Gujarat.
Power Grid Corporation of India Ltd., Hemkunt Chambers, 10th Floor, 89 Nehru Palace, New Delhi.
Bored cast-in-situ piles of 1200 mm dia and pile caps.
Power Grid Corpn. of India Ltd., New Delhi.
6
Construction of Jetty & Pile foundation for 63 m³ capacity L.P.G.Bullets at Kakinada, A.P.
Shri Shakthi LPG Ltd., Adjacent to Airport, Begumpet, Hyderabad – 16.
Design and construction of 500 mm dia bored piles and pile caps.
Dalal Consultants, Mumbai.
7
Construction of pile founda-tions for Horton Spheres and LPG bullets at Kakinada, A.P.
Shri Shakthi LPG Ltd., Adjacent to Airport, Begumpet, Hyderabad – 16.
Bored cast-in-situ piles of 700 mm & 1000 mm dia and pile caps.
Dalal Consultants, Mumbai.
8
Construction of Cement Export Jetty at Kharo Creek, Gujarat.
Sanghi Industries Ltd., Sanghi Nagar, Ranga Reddy Dist., A.P.
Bored cast-in-situ piles of 900 mm, 1000 mm, 1200 mm & 1300 mm dia cross head beams, Longitudinal beams & deck slab.
Engineers India Ltd., New Delhi.
9
Soil Densification for Stone Column Method and providing Tank pad foundations at Visakhapatnam.
Hindustan Petroleum Corporation Ltd., Visakhapatnam.
Stone Columns work.
Engineers India Ltd., New Delhi.
10
Provision of Sea water Intake Complex in A.P.
Visakha Aqua Farms, Visakhapatnam.
Sea Water Intake Complex.
----
11
Construction of RCC diaphragm wall for Embassy Heights at Bangalore.
Embassy Investments, 101/102, Embassy Chambers, 5, Vittal Mallaya Road, Bangalore.
600 mm thick RCC diaphragm wall with Rock Anchors.
Venkataramana Associates, Bangalore/ACE Consultants, Pune.
12
River crossing Foundations for 800 KV Kishenpur Moga Transmission Line Project.
Power Grid Corporation of India Ltd., New Delhi.
1200 mm dia Bored cast-in-situ Piles and Pile caps.
Power Grid Corpn. of India Ltd., New Delhi.
13
Construction of T-shaped Diaphragm walls for Ship Breaking Project for Gujarat Pipavav Port Ltd., Mumbai.
KOATEX Infrastructural Ltd., 5th Floor, Krishna Towers, Plot No. 38, Sector-II, Belapur, CBD, Navi Mumbai.
T-Shaped Diaphragm walls with Rock anchors for Ship-breaking docks at Pipavav, Gujarat.
Overseas Ship Building Corpn. Centre, Yokahama, Japan.
14
Construction of Civil works for Oil Terminal at Navghar.
Indian Oil Tanking Ltd., Mumbai.
Bored cast-in-situ piles of 800 mm and 900 mm dia and pile caps.
Dalal Consultants & Engineers Ltd., Mumbai.
15
Pile foundation for 400 KV DC line Tower crossing across River Krishna.
Chief Engineer, APSEB, Hyderabad, A.P.
Bored cast-in-situ piles of 1200 mm dia and Pile cap.
Central Electricity Authority, New Delhi.
16
Bridge across Gowtami Branch of River Godavari between Yanam-Yedurlanka in East Godavari Dist. (A.P).Length of Bridge across Gowtami - 1800m Length of Approach Road Bridge across rive Gowtami - 43.24m Length of Bridge across River Coringa - 68.04m
Engineer-in-Chief (R&B) (Admn. & EAP), Govt. of Andhra Pradesh, Hyderabad. Public works Department, Govt. of Pondicherry Yanam
Design of Pile Foundations at Pier Location and Abutment Location.
Consulting Engg. Services, New Delhi.
17
Supply of Make-up Water System Turnkey Package for Simhadri Thermal Power Project, Stage-I for NTPC Visakhapatnam (2 x 500 MW).
NTPC, New Delhi.
Design of Approach Jetty, Civil works for Sea water and Sweet water Systems, Mechanical works laying pipelines.
SPA, Mumbai
18
500 KV HVDC Kotanandur Krishna River Crossing Line – Pile Foundation for Godavari and Krishna River crossings.
Jyoti Structures Ltd., H-37, MIDC, Nasik.
Design of Pile Foundation for Towers.
Power Grid Corpn. of India Ltd., New Delhi.
19
Bridge across River Krishna Pulligadda to Penumudi Krishna Dist. (A.P). Length of Bridge across River Krishna - 2580m Length of Bridge across Puligadda Canal - 31.26m Length of Bridge across Penumudi Canal - 31.26m Length of Bridge Parallel to Cambell Aqueduct - 378.72m Length of Crossover across creek at Hamsaladeevi - 48.90m
Government of Andhra Pradesh Road & Buildings Department.
Design of Pile Foundations at Pier Location and Abutment Location for Bridge Across Krishna river, Cambell Aqueduct, Pulligadda canal, Penumudi canal.
IIT Madras, Chennai.
20
Package AP-6 Length of Bridge across river Bahuda (227/4) - 166.40m
National Highways Authority of India, New Delhi
Design of Pile Foundations at Pier Location and Abutment Location.
IIT Madras, Chennai.
21
Nellore Bypass Length of Bridge across river Pennar - 846.05m Length of Bridge across Jaffer Saheb canal - 31.22m Length of Bridge across Sarvepalli canal - 33.676m Length of Bridge across Krishnapatnam canal - 15.79m
National Highways Authority of India, New Delhi
Design of Pile Foundations at Pier Location and Abutment Location for Bridge Across Pennar river, Jaffer Saheb Canal Servepalli canal&Krishnapatnam Canal.
M/s. Scott-Wilson
22
Package - IIB Length of Bridge No. 37/2 -74.96m Length of Bridge No. 473/1 -44.25m
National Highways Authority of India, New Delhi
Design of Pile Foundations at Pier Location and Abutment Location for Bridge No. 37/2 & Bridge No. 473/1.
Chief Engineer CES-BECA (JV), Site office, Kadwai Nagar, Kanpur.
23
Bhima Lift Irrigation Project at Kothakota
Irrigation & CAD dept. Govt. of A.P
Design of Tunneling works
CAD dept.
24
Kalwakurthy Lift Irrigation Project at Mahaboobnagar
Irrigation & CAD dept. Govt. of A.P
Design of Tunneling and Pump house works
CAD dept.
25
4-Laning & Strengthening of Tindivanam –Tiruchi Section of NH-45 At Tamilnadu VIC
National Highways Authority of India, New Delhi
Design of Pile Foundations at Pier and Abutment Locations for Major Bridges, Minor Bridges, Grade separators, Robs, Rubs & VUPs.
IIT Madras, Chennai.
26
Bangalore Metro –East West Corridor Baiyappanhalli Cricket Stadium section
Bangalore Metro Rail Corporation, Bangalore
Design of enabling structures for the Void duct
Indraprasta
27
Highway Project at Bangalore – Nelamangala Section of NH-4
National Highways Authority of India, New Delhi
Design of Pipe culverts, Box culverts, Minor bridges, Super & sub structures of flyover.
Aarvee Associates Bangalore
28
Construction of Flyover (Civil Works) at Narayana T-Point, Ring Road, New Delhi
P.W.D., New Delhi
Design of enabling structures.
P.W.D., New Delhi
29
Construction of Grade separator at Ring Road, GT Karnal Road Intersection at Azadpur, Delhi
P.W.D., New Delhi
Construction of Main Flyover including underpass pedestrian, Bus bays, Service road, Drainage Electrical, Landscaping & Allied works. Design of enabling structures
P.W.D., New Delhi
30
Construction of Flyover covering Najafgarh & Kirari Mor Intersection on NH-19 at Nangloi, Delhi
P.W.D., New Delhi
Design of enabling structures for fly over
P.W.D., New Delhi
31
T-Junction on Sector 14A. Noida
P.W.D., New Delhi
Design of enabling structures for flyover
P.W.D., New Delhi
32
2x500 MW Unit 1 & 2 at Koderma Thermal Power Station, Jharkhand
BHEL, Kolkata
Design of enabling structures
BHEL, Kolkata
33
Prestige Center court, B’lore
Prestige Estates Projects
Design of Diaphragm wall and allied works
IIT Madras, Chennai
34
Barh STPP Stage 2 TG Area
NTPC
Design of Enabling structures
NTPC
35
Barh STPP Stage 2 SG Area
NTPC
Design of Enabling structures
NTPC
36
270MW Coastal Thermal Power project at Tamminapatnam, KPCL
Madhucon Projects ltd.
Construction of Civil Works
M.N.DASTUR
37
2 x 800 MW Thermal power station at KPCL
Indu Projects Ltd.
Piling Works
Tata Construction
38
MMTA Aluminium Refinery at Makavaripalam, Vizag
Anrak Aluminium Ltd.
Design of Pile foundation
39
NRW, 5th & 6th Berths & Approaches at Kakinada
Kakinada Seaports Ltd.
Design of enabling structures.
L&T Ramball & KAKINAD MARINE OFFSHORE
40
Hyderabad - Bangalore NH-7 Section
NHAI, New Delhi
Design of Pile foundation
IIT Madras, Chennai.
41
2x660 MW Coal fired Super Critical PowerProject, Kakarpalli (Bhavanapadu)
East Coast Energy Pvt. Ltd.
Design of Pile foundations & Diaphragm wall for BOP.
Abir Infrastructures, Hyderabad
42
River system & connecting road Between Bomjurmeka(NH-52) & Construction of bridge across river Lohit at Alubarighat, Arunachal pradesh
Ministry of Road Transport & Highways, New Delhi
Design of Pile foundations for bridges across River Dibang
IIT Madras, Chennai.
43
Krishnapatnam Port Company Limited
Krishnapatnam Port Company Limited
Additional infrastructure works & Port Facilities
Navayuga Engineering Company Limited
44
Dhola-Sadia Ghats alongwith connecting roads in Assam
Ministry of Road Transport & Highways, New Delhi
Design of Pile foundation Bridges
IIT Madras, Chennai.
45
Bridge across river Ganga connecting Bakhtiyarpur bypass of NH-31 & Tejpur on NH-28 in state of Bihar
Bihar State Road Development Corporation Ltd., Patna
Design of Pile foundation Development of Greenfield bridge across river Ganga
IIT Madras, Chennai.
46
Krishnapatnam Port Company Limited
Krishnapatnam Port Company Limited
Design of foundations for coal conveyers, junction house & stacker/reclaimer for coal handling plant.
Navayuga Engineering Company Limited
47
Hotel project at Greenhut at IB-167, Salt Lake City, Kolkata
Green Hut Pvt Ltd., Kolkata
Design & Construction of Diaphragm wall work
IIT Madras, Chennai.
48
Khagaria – Bakhtiyarpur section of NH-31 (NHDP Ph.III) BOT
NHAI, New Delhi
Design of Pile foundation for 4 laning works
IIT Madras, Chennai.
49
Buckingham Canal alongwith 156m approach Road on both side of bridge at Panjakuppam, Cuddalore
IL & FS Tamilnadu Power Corporation Ltd., Chennai
Design & Construction of Approach bridge including foundation, substructure & Super structure.
Fichtner Consutants, Chennai
50
2 x 800MW Units of Sri Damodaram Sanjeevaiah Thermal Power Station at Nellore
A.P Power Development co.ltd.
Design, mfg., assembly, testing, supply & construction of shore based intake through open channel.
A.P Power Development co.ltd.