Special Foundations
Marine Structures
Infrastructure Works
Project on In-House Design

 

Projects on EPC/Turnkey and Build Operate & Transfer (BOT) basis
Year
Name of the Project Client
2017
Execution of Stage-2 pumping station (5X30MW) at Jonnalaboguda Balancing Reservoir Near Khanapur Village under EPC/Turnkey Basis, Kalwakurthy.
PA & SE,MGJLIP Circle, Mahabubnagar, Telangana.
2017
Design, Engineering, Finance, Procurement, Construction, Operation and Maintenance of “Four Laning of Kundapur-Suratkal section of NH-17 from km 283+300 to km 358+080 (section 1) and Mangalore – Kerala Border [km 375+300 to km 376+700 (i.e. Nantur circle to Mahaveer circle) and km 3+700 to km 17+200 (i.e. Mahaveer Circle to Kerala border)] (section 2) in the state of Karnataka” (Package No. NHDP-III/BOT/KNT/04).
National Highways Authority of India,  New Delhi.
2017
Project of Construction of a bridge between Dhola and Sadia Ghats along with connecting roads fromnear about Dhola to Islampur tinali in Assam under Arunachal Pradesh Package of Roads and Highways on DBFOT, Annuity Basis.
Ministry of Road Transport & Highways, New Delhi.
2015
Phase-II works of "Civil and Electro Mechanical EPC Package for Development of Krishnapatnam Port".
Krishnapatnam Port Company Limited.
2014
Upgradation, Operation and Maintenance of km 534.720 to km 556.840 of Hyderabad-Bangalore Section of NH-7 in Karnataka NHDP Phase – VII on Design, Build, Finance, Operate and Transfer ("DBFOT"), Toll basis   (Package No.: NS-2/BOT/KNT-2).
NHAI, New Delhi.
2013
Design and Construction of Approach Bridge across Buckingham Canal along with 156m approach road on both sides of bridge at Panjakuram, Cuddalore.
IL & FS Tamilnadu Power Company Ltd., Chennai.
2013
Four Laning of Armur – AdloorYellareddy stretch from Km 308.000 (Armur) to Km 367.000 (Adloor - Yellareddy) of Nagpur- Hyderabad Section on NH-7 in the State of Andhra Pradesh(the project ) through public - private/ public sector partnership (PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis under NHDP Phase-II.
NHAI, New Delhi.
2012

Improvements and Formation of Double Lane Road on Krishna Left Flood Bank from Km. 0.000 to Km. 58.500 in Krishna District.

Govt. of Andhra Pradesh, I & CAD, Hyderabad.
2012
Construction of Chagallu Barrage under PABR Stage –II of Anantapur District(Package No.-33) on EPC basis.
SE, I&CAD, TBPHLC Circle, Ananthapur.
2012
Construction of civil works for sea water intake system on EPC basis for our Phase-I&II Thermal Power Project of SEPL at Thamminapatnam, SPSR Nellore (Dist).
Madhucon Projects Limited, Hyderabad.
2012
BLIP-Lift II – Design & Execution of Stage – 1 and Stage – 2 Pumping Station of Lift – II at Thirumalayapally and Kothakota (V) of Kothakota (M) Mahabubnagar dist on EPC basis.
Executive Engineer, I & CADD RBL-I Execution Division No.2 Pebbair.
2011
Design, Engg, Finance, Construction, Operation and Maintenance of Khalghat - MP/Maharastra Border Section of NH-3 from km 84.700 to km 167.500 in the State of Madhya Pradesh under NHDP Phase IIIA on BOT Basis.
NHAI, New Delhi.
2010
Conventional Tunneling works for Single Point Mooring project at Visakhapatnam.

HPCL, Visakh Refinery, Post Box No.15, Visakhapatnam-530 011

2010
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 Lanning the existing 2 lane section Km 285 (near Padalur) to Km 325 ( near Trichy) on NH-45 in the state of Tamilnadu on Build,Operate and Transfer(BOT) Basis._EPC Bridge Package.
National Highways Authority of India, 1, Eastern Avenue, Maharanibagh, New Delhi.
2010
Design, Engineering, Finance, Construction, Operation and Maintenance of access controlled highway project of the Bangalore - Nelamangala Section of NH-4 from Km10/00 to Km 29/50 in the state of karnataka through a Concession on Build, operate and Transfer (BOT) basis.
National Highways Authority of India.
2009
Design and Construction of Elevated viaduct & Structural work of three elevated stations (Mayur Vihar Phase-I, Mayur Vihar Phase-I Extension & New Ashok Nagar) on Indraprastha – New Ashok Nagar Corridor of Phase-II of Delhi MRTS” (BC-6).
Delhi Metro Rail Corporation Limited.
2009
Extension of North Breakwater and construction of KPCL ware houses at Krishnapatnam port.
Krishnapatnam Port Company Limited, Hyderabad.
2009
LSTK1-Sea Water Intake, Outfall and Product Water Conveyance System for CPCL, Chennai.
CPCL, Manali, Chennai.
2008
Civil and Electro Mechanical EPC Package for Development of Krishnapatnam Port. (Phase-I).
Krishnapatnam Port Company Limited, Hyderabad.
2005
Design & Construction of Two lane ROB near Duvvada Railway Station.
South Eastern Rly., Bhubaneswar.
2004
Bridge across River Krishna between Puligadda and Penumudi in A.P on B O T Basis.
R& B, Dept, Govt. of A.P.
2004
Nellore Bypass Project on National Highway No.5 from Km. 161.034 to Km. 178.200 on BOT basis on Annuity Approach (Project).
NHAI, New Delhi.
2003
Supply of Make-up Water System Turnkey Package for Simhadri Thermal Power Project, Stage-1 for NTPC Visakhapatnam (2 x 500 MW).
National Thermal Power Corporation, New Delhi.
2002
Bridge across River Godavari between Yanam and Yedurlanka in East Godavari Dist.(A.P) on BOT Basis.
Engineer-in-chief (R & B),(Admn. & EAP), Govt. of A.P. Hyderabad.