Special Foundations
Infrastructure Works
EPC / BOT Projects
Sl.No. Description Name of Client
1
Construction of Sri Komaram Bhim Project (Pedda vagu project) near Ada village, Asifabad Mandal, Adilabad District. (Package No.18)
SE, I&CAD, MIP Circle, Bellampally, Adilabad Dist.
2
Sripada Sagar Project – Stage II, Phase - I
SE, I&CAD, Mancherial, Karimnagar Dist.
3
Execution of Stage - 2 pumping station (5X30MW) at Jonnalaboguda Balancing Reservoir Near Khanapur Village under EPC/Turnkey Basis, KALWAKURTHY
PA&SE, MGJLIP Circle, Mahabubnagar
4
Pranahitha - Chevella Lift Irrigation Scheme - Link II - Package No - 6
SE, I&CAD, Sripada Yellampally Project Circle, Macherial, Adilabad Dist, AP
5
Pranahitha - Chevella Lift Irrigation Scheme - Link VII - Package No - 21
SE, I&CAD, NSLI Circle, Nizamabad Dist, AP
6
Design, Engineering, Finance, Procurement, Construction, Operation and Maintenance of "Four Laning of Kundapur Surathkal section of NH-17 from km 283+300 to km 358+080 (Section 1) and Mangalore – Kerala Border [km 375+300 to km 376+700 (i.e. Nantur circle to Mahaveer circle) and km 3+700 to km 17+200 (i.e. Mahaveer circle to Kerala border)] (Section 2) in the state of Karnataka" (Package No. NHDP-III/BOT/KNT/04)
National Highways Authority of India, New Delhi
7
Rehabilitation, Strengthening and four Laning of Quazigund to Banihal Section of NH-1A from Km 189.350 to Km 204.700, including 2-tunnels (2-lane) of 0.69 Km & 8.45 Km length, on DBFOT (Annuity) basis, in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)
National Highways Authority of India, New Delhi
8
Construction of bridges across Dibang river system and connecting road between Bomjur - Meka (NH-52) covering length of 18.950 km; and construction of bridge across river Lohit at Alubari Ghat and connecting road between Chowkham - Digaru covering length of 12.00 km, in Arunachal Pradesh (total 30.950 km) under Arunachal Pradesh Package of Roads and Highways on DBFOT, Annuity basis
Ministry of Road Transport & Highways, New Delhi
9
Project of Construction of a bridge between Dhola and Sadia ghats alongwith connecting roads from near about Dhola to Islampur tinali in Assam under Arunachal Pradesh Package of Roads and Highways on DBFOT,Annuity Basis
Ministry of Road Transport & Highways, New Delhi
10
Development of Greenfield Bridge across River Ganga Connecting Proposed Bakhtiyarpur bypass of NH-31 near village Karjan & Tajpur on NH-28 in the State of Bihar on DBFOT (Toll) basis
Bihar State Road Development Corporation Limited, Patna
11
Piling and Civil Works for 2x660 MW Coal fired super-critical power project at Kakarapalli, Srikakulam District, Andhra pradesh
East Coast Energy Pvt.Ltd., Hyderabad
12
Execution of Narmada Malwa Gambhir Link Scheme on "Turnkey" basis comprising of lifting 15 cumecs of water from junction structure of Omkareshwar right bank main canal near RD 9.775 Km. and providing water for irrigation to minimum 50000 ha.CCA. in between Chambal & Kshipra rivers in Indore & Ujjain districts of Madhya Pradesh
Chief Engineer, Lower Narmada Projects, Narmada Valley Development Authority, Madhya Pradesh